SDA was the maintenance traffic lead for a 3-mile portion of the I-90 corridor adjacent to Keechelus Lake east of Hyak. The role required management, oversight and design for 10 constructions stages. Each stage required roadway design plans including horizontal control, profiles, sections and channelization plans to maintain the continuous operation of 2 travel lanes in each direction during construction.